The 5th pathway is 80% complete and is looking great. A huge thanks to Ross, Peter and Jimmy for the great work in cutting the tiles and laying, and to Jeff and Trent from the staff who also contributed to the completed works.
Fairways were fertilised early last week and the results are outstanding. All fairways were cut today and look great.
Agapanthus removed by the boys, Garden Club weed, prepare and plant Acacia's, and the boy's mulched this morning. Team effort, great result
A photo of the 12th green after having been cut at 3 mm with the walk behind mowers. Reports during the week have been positive after the full renovation 2 weeks ago. If the rain stays away we will cut and roll in the morning.
Greens will be mowed tomorrow morning for the 1st time since renovations at a height of 4.5 mm. Next week they will gradually be lowered back to our normal cutting height of 3 mm. As of Monday the 5th September walk behind mowers will be back in use.
42mm of rain overnight has left a lot of bunkers with water in them. This is young Tarek from Greystanes high school who comes in on Thursdays as part of their Work education life skills program pumping water from the 16th bunker. It will take around 8 hours to pump them all out ready for raking tomorrow afternoon.
|
Archives
March 2017
Categories |